Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Adeli, H and Karim, A (1997) Scheduling/Cost Optimization and Neural Dynamics Model for Construction. Journal of Construction Engineering and Management, 123(04), 450–8.

Arditi, D, Kale, S and Tangkar, M (1997) Innovation in Construction Equipment and Its Flow into the Construction Industry. Journal of Construction Engineering and Management, 123(04), 371–8.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1997)123:4(371)
  • Abstract:
    The rate of innovation in construction equipment is measured by using two variables over a 30-year period, 1962–92: The number of new models introduced every year and the technological life of eight earthmoving equipments are considered in this study. The findings indicate that the rate of innovation in the construction equipment industry increased in the 30-year study period. The findings also suggest that these innovations are incremental in nature, stimulated by technological advances in other industries, but primarily driven by market forces. Technological advances are not confined to the industry that produces innovations. The mapping of the interindustry flow of innovations highlights that while construction companies play a predominant role in generating their own technological innovations, they are also heavily dependent on other industries, such as the construction equipment industry for the flow of technical system innovations. As such, the continuous and incremental innovations in the construction equipment industry are bound to act as a catalyst for the generation of technological advances in the construction industry.

Hartman, F, Snelgrove, P and Ashrafi, R (1997) Effective Wording to Improve Risk Allocation in Lump Sum Contracts. Journal of Construction Engineering and Management, 123(04), 379–87.

Jaafari, A (1997) Concurrent Construction and Life Cycle Project Management. Journal of Construction Engineering and Management, 123(04), 427–36.

Kang, L S and Paulson, B C (1997) Adaptability of Information Classification Systems for Civil Works. Journal of Construction Engineering and Management, 123(04), 419–26.

Pocock, J B, Liu, L Y and Kim, M K (1997) Impact of Management Approach on Project Interaction and Performance. Journal of Construction Engineering and Management, 123(04), 411–8.

Portas, J and AbouRizk, S (1997) Neural Network Model for Estimating Construction Productivity. Journal of Construction Engineering and Management, 123(04), 399–410.

Schexnayder, C and Ohrn, L G (1997) Highway Specifications—Quality versus Pay. Journal of Construction Engineering and Management, 123(04), 437–43.

Touran, A (1997) Probabilistic Model for Tunneling Project Using Markov Chain. Journal of Construction Engineering and Management, 123(04), 444–9.

Venegas C., P and Alarcón C., L F (1997) Selecting Long-Term Strategies for Construction Firms. Journal of Construction Engineering and Management, 123(04), 388–98.

Walsh, K D, Houston, W N and Houston, S L (1997) Field Implications of Current Compaction Specification Design Practices. Journal of Construction Engineering and Management, 123(04), 363–70.